Stage gate process: how 33 R&D organizations run their gates


A stage gate process splits R&D work into stages and puts an investment decision, the gate, between them. ITONICS analyzed how 33 R&D organizations run theirs based on discussions we had with them between October 2025 and November 2026. The three strongest findings are that stage names follow the industry, gate counts converge on four to six, and the process breaks at two handovers.
The world's 2,000 largest R&D investors spent €1,446 billion on R&D in 2024, over 90% of business-funded R&D worldwide (European Commission JRC, 2025). Gates decide where that money goes, which makes their design a capital allocation question. Heads of R&D, portfolio offices and innovation teams can use these findings as a benchmark for a gate process in new product development, and the stage gate software review covers tool selection.
| Finding from 33 R&D organizations | Recommendation |
|---|---|
| Stage names follow the industry, with scale in chemicals, readiness in energy and defense, and commercial proof in consumer goods | Name each stage after the evidence its gate buys |
| Complete sequences run four to six gates, median five | Start from five gates; add lanes before gates |
| 19 of 33 add hold, rework or conditional go to go and kill; 12 of 33 run lanes by project type or risk | Define each extra outcome with an owner and a review date |
| Early gates rank with scorecards; late gates verify against evidence thresholds | Write the decision rule before the first gate meeting |
| 22 of 33 run two linked processes, while only 2 of 33 run a transfer gate into operations | Add a gate per handover, signed by the receiving owner |
| 7 of 33 release a budget tranche at each gate | Attach a budget decision to every gate |
Exhibit 1: Core findings from 33 R&D organizations
A stage gate process is a governance framework for managing innovation in R&D and new product development. Work moves through stages, and each stage ends with key deliverables that a gate reviews before the project progresses to the next stage. The stage gate model goes back to Robert G. Cooper's research on new product success in the 1980s (Business Horizons, 1990), and Stage-Gate® is a registered trademark of Stage-Gate Inc.
Each gate is an investment decision to go, kill, hold or recycle a project. A gate that releases budget and resources allocates capital in small steps, while a gate without that consequence produces status updates. The budget link separates a capital allocation system from a reporting calendar.
R&D and product teams call the method stage gate, while engineering and project management offices call the same method phase gate. Phase gate project management places the gate inside one project plan. A stage gate process places it in the portfolio, where every project competes for the same budget, the core question of project portfolio management.
Agile practices come from software development and organize the work inside a stage into sprints. In these hybrid models, the gate remains the funding decision. One industrial manufacturer in our sample lets each project team choose agile or waterfall execution and keeps formal gates above both.
Most companies in our sample map onto five stages after intake, whatever they call them. Early stages are cheap and screen many options, while later stages are expensive and fund few. Each gate therefore asks for more evidence than the one before, in proportion to the money it releases.

Exhibit 2: The stage gate model as 33 R&D organizations run it
New product ideas, customer needs and market signals enter through forms, campaigns and scouting, and innovation teams assign evaluators. One industrial services group keeps intake to four mandatory fields. Gate 1 then screens new ideas for strategic fit.
Scoping runs on desk research. Expert teams rate each concept on strategic fit, market size, technical feasibility, IP potential and speed to market. A specialty chemicals maker shows how the weights encode strategy, with profitability at 50% and sustainability at 20%. Gate 2 selects the concepts that progress to the next stage.
The project team builds the economics, from sales volume and price to CAPEX, OPEX and risks. Gate 3, go to development, is the first large commitment of capital. An industrial manufacturer with 150 to 200 active projects passes 60 to 70 percent of ideas through its first gate and concentrates its kills at the business case.
Projects progress from lab to pilot and from prototype to market tests with customers. Gates check test results, readiness levels and regulatory and IP clearance against set thresholds. A building-materials group runs four parallel reviews here, and a single fail sends the project back.
The final gate commits the largest sums, for tooling, production, market launch or a handover to an operating unit. A post-launch review then checks market success. An African consumer goods group reserves the kill decision for this review, 60 to 90 days after launch.
Stage names follow the evidence each industry buys at its gates, and each name tells the team what the next gate will test. Chemicals companies buy proof of scale, energy and defense organizations buy technical readiness, and consumer goods companies buy commercial proof. Beneath the vocabulary, the architecture converges, and the nine organizations that described their full sequence from intake to launch run four to six gates, median five.
Nineteen of 33 organizations give their gates at least one outcome besides go and kill, and three types recur.
A gate limited to go and kill forces a binary call on incomplete evidence. Committees then push half-proven projects forward or end promising ones before the evidence arrives. Define each extra outcome with an owner, a review date and a budget consequence, so every held project returns to the gate on schedule.
About the research. We coded the innovation processes of 33 organizations in five industry clusters, based on our conversations with them between October 2025 and November 2026. The clusters are energy, public sector and defense (8), chemicals and materials (7), industrial manufacturing (7), food and consumer goods (7), and services and life sciences (4). Each count reports how many organizations described a practice in those conversations.

Exhibit 3: Stage and gate names by industry
Four of seven chemicals and materials companies name stages after the size of the test, from lab and pilot scale to scale-up. Each step up in scale multiplies cost, so the gate before it tests whether the result holds at the next size. Gate evidence moves from lab results and a formulation to a test plan and a cost estimate. A Southeast Asian group routes projects back to a defined pivot stage when pilot results miss, so the next pilot starts from the failed one's data.
Five organizations name stages or gates after technology readiness levels (TRL), all in electricity, grid equipment, minerals, nuclear or defense. TRL gives them a scale that engineers, public funders and project partners already use, so gate results compare easily. A European grid operator runs Stage 0 for research studies at TRL 1 to 3, then a business case, experimental development and a demonstrator. At a US grid equipment maker, a technical committee accepts each TRL step and a steering committee approves concepts and closes projects.
Consumer goods companies run many small projects beside a few large bets, so they scale the gate effort to the size of each bet. A South Asian food manufacturer sends new products through all five gates and cost projects through a Just Do It lane. A US food and beverage maker designs three lanes, from core flavor extensions to new categories and markets. Its reviewers move an idea to another lane when reassessment shows a different innovation type, for example from stretch to transform.
Six of seven industrial companies run numbered gates or unit-specific versions. An industrial services group names its gates SG-1 to SG5, labels that travel unchanged across units as different as engineering and scaffolding. The evidence standard sits in a checklist behind each number, with five topics such as business value, customer value and strategy fit. The questions under each topic grow longer from one gate to the next.
The price is consistency, because five of seven industrial companies describe gates that run informally or are unevenly enforced. A motion-control manufacturer found that each of its 12 to 15 business units followed its own reading of the published process. Its gates could pass a project on the word of a single customer who liked the idea. At a multi-plant manufacturer, some sites run a gatekeeping step, while at others project owners move projects to the next phase themselves.
A portfolio office then compares projects that passed the same gate number on different evidence. One checklist per gate number, owned centrally and applied in every unit, restores a comparable portfolio.
Front gate reviews rank many innovation candidates with weighted scores. Back gate reviews verify a few projects against evidence thresholds. Both depend on codified decision rules that exist before any decision meeting.
Early gates compare dozens of ideas at low cost, and weighted scorecards fit that job. A building-materials group scores first reviews on six criteria, from IP potential to time to market. In our sample, must-meet questions such as strategic fit remove misfits first, and weighted criteria then rank the remainder by value.
Later gates commit large resources to few projects, so they test evidence against minimum thresholds. A specialty chemicals group asks each project lead to self-assess desirability, viability and readiness before the committee meets. TRL sets a technical floor, and a Latin American minerals company added a business assessment beside it because management needs a commercial view.
Four organizations set a quorum, such as unanimity or 8 of 10 votes. A written quorum ties each gate decision to a recorded vote of the committee.
| Gate | Criteria form | Evidence required | Example from the sample |
|---|---|---|---|
| Gate 1 (idea screen) | Must-meet checklist | Completed form, owner, strategy link | Four mandatory fields per idea |
| Gate 2 (concept ranking) | Weighted scorecard | Expert ratings with rationale | Profitability weighted 50% |
| Gate 3 (go to development) | Financial hurdles plus scorecard | NPV or ROI, CAPEX, OPEX | Three-year plan at the first gate |
| Gate 4 (test evidence) | Pass or fail per function | Test results, TRL, IP clearance | Four parallel reviews |
| Gate 5 (launch or transfer) | Pass or fail with a named receiver | Launch or adoption plan | Receiving owner named at the gate |
Exhibit 4: Gate criteria by gate in the ITONICS sample
The stage gate process breaks where one process hands over to the next, because owner, data and budget all change at that moment. Two-thirds of the sample (22 of 33) run two linked processes, an idea funnel for the innovation process followed by a project stage gate. Five of them reported trouble at the conversion, and only 2 of 33 run a formal transfer gate into operations.

Exhibit 5: The two handovers in the stage gate process
At least five organizations switch to a different project system at the conversion gate, such as Workfront, Project Online or PLM. A European rail infrastructure manager moved to a project-led process after idea meetings produced initiatives too immature to fund.
The second handover moves validated solutions into the business unit that will run them. A European grid operator closes with Gate C, where the business line approves an adoption plan and takes ownership. A Latin American university, by contrast, loses pilots in operations to gaps in systems, staffing and documentation. Give each handover its own gate, and make the receiving owner a signatory.
The verdicts rest on how often each variant appears in our sample and where it caused friction.
| Variant | Verdict | Reason |
|---|---|---|
| Budget tranche per gate | Keep | Funds subsequent stages in steps and caps sunk costs |
| TRL thresholds | Keep | Give technical gates an objective floor |
| Lanes by risk | Keep | Scale the process to each project's risk |
| Agile-Stage-Gate | Adapt | Run sprints inside stages, keep gates as funding decisions |
| One process for every project | Retire | A new market entry needs different evidence than a cost project |
| Gate packs rebuilt in PowerPoint | Retire | Copied decisions split the record |
Exhibit 6: Stage gate variants by verdict
Four moves address the failure points in our sample and tie the gates to portfolio management.
Map the process teams run. Published processes drift from practice. The motion-control manufacturer mapped the workflows its units actually run before configuring a tool.
Set lanes by risk before adding gates. A full five-gate path is too heavy for small, fast projects. A building-materials group runs a self-serve lane where local teams approve bottom-up projects.
Release investment gate by gate. Seven organizations in the sample tie a budget tranche to each gate. Align the tranches with the annual R&D budget cycle.
Move the gate record out of Excel. A global spirits company makes gate decisions in PowerPoint and Excel, then copies them into its portfolio system. Teams replace Excel for R&D portfolio management once gate data needs an audit trail.
A workflow tool keeps the four moves in force, because teams model their own process in it and record every gate decision in one place. Exhibit 7 shows an initiative process built in the ITONICS workflow builder, with discovery, concept, pilot and ramp-up phases. Every team sees the same deliverables and criteria at each gate, so a portfolio office compares projects on the same evidence.
Each gate names its reviewers and a minimum number of approvals, which writes the quorum into the process. A reviewer who finds an evidence gap requests changes, and rework becomes a standard gate outcome. The owner gets an automatic email, while the request and the decision update the project record and every portfolio view at once.
/Still%20images/Workflow%20Builder%20Mockups%202025/capabilities-workflows-create-working-processes.webp?width=1600&height=1000&name=capabilities-workflows-create-working-processes.webp)
Exhibit 7: The ITONICS workflow builder allows structured progression and recording of results
ITONICS is strategic portfolio intelligence for enterprise R&D and innovation. It runs the stage gate process as configurable workflows with phases and gates, on the same data record as trends, technologies and the R&D portfolio.
Toyota Motor Europe runs proposal pitches for R&D and production engineering on the platform. Experts evaluate the pitches there and turn selected ones into innovation initiatives.
In stage gate product development, most organizations in our sample run five stages, from discovery and intake through scoping and concept, business case, and development and testing to launch or transfer. A post-launch review measures market success. Chemicals companies name stages after lab and pilot scale, energy companies after readiness levels.
Both describe the same method, which R&D teams call stage gate and project offices call phase gate. Phase gate project management places gates inside one project plan. A stage gate process places them in the portfolio, where projects compete for one budget.
Early gates use must-meet questions and weighted scorecards on strategic fit, market size, technical feasibility and time to market. Later gates check test results, readiness, IP clearance and NPV or ROI. The last gate needs a named owner for launch or operations.
Large enterprises need recorded gate decisions, portfolio data and an audit trail. ITONICS combines configurable stage gate workflows with portfolio views, Prism AI evaluation and API, MCP and BI connections. KSB cut idea processing time by 60% with 7,043 active users in 16 locations.
A stage gate process needs forms, scoring, approvals and one decision record. ITONICS provides a visual Workflow builder for gates, role-based approvals, an audit trail and pipeline views. Dräxlmaier centralized its pre-development workflows in ITONICS and cut manual project reporting effort by 70%.